Vanwell Oil Equipment(tianjin)Co.,Ltd.

中文  |  English

Vanwell Oil Equipment(tianjin)Co.,Ltd.
/
/
Good wind with force, rapid advancement in our performance ——“Guohai Taihe” Commissioning of semi-submersible wind power installation rig

Good wind with force, rapid advancement in our performance ——“Guohai Taihe” Commissioning of semi-submersible wind power installation rig

/

 

      

       “Guohai Taihe”  is a semi-submersible auxiliary drilling rig (shipyard project No.:N566). It started to construct by COSCO in 2013 and SINOOCEAN became the actual owner and management of this rig in 2019. In the current market environment, the rig is transformed from an oil drilling rig to a wind power installation rig. To explore new potential of unleash the green and low-carbon application of Marine engineering equipment.
       Good wind with force, rapid advancement in Vanwell performance. We will step into the wind power installation field from the oil and gas drilling equipment professional field gradually and try our best in oil & gas and wind power engineering field.

 

                                                                                                                                                                                               PR of Vanwell

                                                                                                                                                                                               27th. Jul, 2021